Lots of Updates…

So much has been going on here the past couple of weeks.  We’re pushing hard to get the house liveable by October.

My mind has mostly been fixed on getting our property line/tax situation straightened out with the Town Planning Board. To sum up what’s going on there…TOWN BUREAUCRACY IS SUCKING THE LIFE OUT OF ME. I can’t even express my frustration with what’s going on so I’ll just move on from that subject until there is happy news to report there. I’ve also been consumed with filing a Notice of Intent with the Conservation Commission to work on our driveway and have gas run to the house.  When all was said and done, I submitted about 300 pages of paperwork to nine different state and local agencies who get to have a say about where we put our driveway. NINE! This is a small-government libertarian’s nightmare. The hearing is next week so hopefully that goes smoothly.

But now to the fun stuff! New plumbing has been run, the electric service has been upgraded to 200 amp and the exterior restoration is complete (minus windows which we’ll be doing later).

Final coat of stain going on.
Final coat of stain going on.

The outside of the house looks so pretty I just want to hug it! J has been working like a beast on the inside. Check it out.

New framing for basement door and entry closet.
New framing for basement door and entry closet.
Framing finished in master bedroom.
Framing finished in master bedroom.
Framing finished in T's room.
Framing finished in T’s room.
Installing new bathroom vent.
Installing new bathroom vent.
Fixing some bowing in the upstairs floor around the chimney due to settling.
Fixing some bowing in the upstairs floor around the chimney due to settling.

He’s awesome. He’s been busy framing, prepping the subfloor for our new floors and doing a whole bunch of other stuff that I am completely unskilled, and frankly uninterested, to do.  J gets a little frustrated with me because I’m already 10 steps ahead of him and picking out paint colors and counter tops.

So I’ve kept myself busy working on the barn. I spent a weekend getting it ready for our very first farm animals, goats (aka the landscape crew)!

Barn after clean up.
Barn after clean up. Can you believe this was piled front to back, side to side and bottom to top with trash?! The bags of packing peanuts that broke everywhere and the 500 empty beer bottles were especially nice.
Barn ready for its new residents.
Barn ready for its new residents.
Maaaaaaa!
Maaaaaaa!
One of the new landscapers hard at work.
One of the new landscapers hard at work.
Our little goatherd.
Our little goatherd.

One of the things on our to-do list was sand the interior walls and ceilings.  I did about 3/4 of one room with a 80-grit brush on a rotary grinder and had to be just about peeled off the floor at the end of it.  There was no way we were going to be able to do every surface in the house that way.  So we had a gentleman come corn cob blast the whole interior this past week.  The difference is unbelievable!

Entryway after interior corn cob blasting. Welcome to our indoor beach!
Entryway after interior corn cob blasting. Welcome to our indoor beach!
Great room beams after corn cob blasting. Such a difference!
Great room beams after corn cob blasting. Such a difference!
Great room after interior corn cob blasting.
Great room after interior corn cob blasting.

I’ll post some pictures after it’s all cleaned up this weekend. Even with the stress and hard work, we are so excited to make this dream come true!

Views of the sunset on the pond, 2 minutes from our door. Unbelievable!
Views of the sunset on the pond, 2 minutes from our front door. Unbelievable!
Advertisement

5 thoughts on “Lots of Updates…

Add yours

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

Up ↑

%d bloggers like this: